Sr Project Engineer Electrical

Check with seller
Labour/Helper Jobs
1 month
India
Kerala
0 views
ID: 604599
Published 1 month ago by TIRUPATI SALES CORPORATION •
Check with seller
In Labour/Helper Jobs category
Thrissur, Kerala, India
Get directions →
0 item views
Work Experience : - 8 - 10 Years

1. Technical Expertise :

Strong understanding of Project life cycle of EPC Jobs.

Familiarity with electrical codes and regulations.

Required cadidate should be well versed / Proficient / Understanding of Electrical ELV works for Commercial Buildings / Spaces and should know most of the requirements below listed : -

Well Versed with Design , Installation Testing Commissioning of Internal Point Electrical Wirings

Well Versed with Design , Installation Testing Commissioning of Distribution Boards

Well Versed with TTA type HT , LT Sub Panels Design , BOM Validation , Installation Testing Commissioning

Well Versed with Installations laying of Cable Trays , Raceways , PVC GI Conduits along with Cable Layings and Terminations

Well Versed with APFC Panels Design , BOM Validation , Installation Testing Commissioning

Well Versed with Design , Installation Testing Commissioning of External Lighting

Well Versed with Installations , Terminations, Testing Commissioning of Dry Type Transformers

Well Versed with Design , Installations , Terminations, Testing Commissioning of Lighting Protection System

Well Versed with Design , Installations , Terminations, Testing Commissioning of Earthings

Well Versed with Installations , Terminations, Testing Commissioning of Solar Panels

Advantage : -

Should have knowledge of Extra Low Voltage Works ( like Fire Alar System , PA system , Networking Wifi System, CCTV System , Access Control System, BMS system , EPABX System

2. Roles Responsibilities : -
• Provide inputs for bar chart preparation, Selection of site staff, working team and sub contractors.
• Provide Inputs for change in design or make of material, client details, consultants details, inventory forms etc.
• Develop the rappo with client site team.
• Day to Day site monitoring progress report to Project Manager back office.
• Every Commercial Project Site Incharge has to stay at office from 6 : 30pm to 7 : 30pm daily or minimum three days Provide WEEKLY LOOK AHEAD for material requirement and other technical input to back office.
• Control Coordinating the workers.
• Planning of the material is to be done for prevention of Financial Loss stress creation and Building a good image.
• Making of Material Requisition (MR) in standard format clearly define the day on which material will be rquired. MR should be approved through Manager (Projects) then sent to Purchase dept.
• Responsibility to submit any papers related to the site in the back office to the appropriate department.
• Site administration, Establishment of site facilities.
• Make Arrange the Space to safeguard the material on site untill the completion of Project.
• If Received Challan copy is not received(Local Site : Max. 3 Days, Outside site : Max. 7 Days) Information to Purchase Assistant (Mr.

Girish) should be provided and close the loop.
• Make DPR and weekly progress report of the work completed and submitt to Manager (Projects).
• The Measurement sheet of the work done should be prepared submitted to the client for certification by client representative before 10th of every Month.
• Responsibility to complete the work as per the given commitment to client.
• Getting completion report after completion of the Project Submit for invoicing in maximum 15 Days after completion of Project.
• Incharge has to report confidential report to the project subordinates.
• After Completion of work excess material is to be submitted in store after reconcillation as per format.
• Responsible for liasioning activities including Co-ordination with Head Office, Consultants, Site supervisors client representative.
• Ensure mobilization and proper utilization of resources.
• Planning, monitoring controlling all site activities including manpower planning, resource planning material planning and finalization of responsibility matrix for site engineers.
• Ensuring all site activities are carried out as per SOPs (standard operating procedures), DACP as per ISO +001, OHSAS (ISO 18001), Project specification.
• Analyzing the major scope of work at site (as per the Contract) and discussing with various disciplines for criticalities strategies for timely completion of site work.
• Coordinating monitoring with various site contractors and nominating engineers, site supervisor for supervision of work of various contractors
• Attending site coordination meeting with client on regular basis for reviewing site progress resolving problems
• Responsible for Project Cost control and analysis for site activities.
• Co-ordination with Project Manger and all persons related to the site.
• Providing required information to back office for smooth execution of projects such as all statutory compliance as per client requirement.
• Responsible for highest quality deliverance with respect to aesthetics electrical safety.
• Site incharge is responsible to get the original invoice and send it to H.O within 3 working days from date of purchase or service to avoid accounting discrepancy.

3. Software Workings :

Autocads , MS Office , Beam

4. Educational Background :

A degree in Electrical Engineering, Electrical Technology, or a related field.

Higher Degree shall be advantageous if any Read more

Published on 2025/09/10. Modified on 2025/09/10.

Description

Work Experience : - 8 - 10 Years

1. Technical Expertise :

Strong understanding of Project life cycle of EPC Jobs.

Familiarity with electrical codes and regulations.

Required cadidate should be well versed / Proficient / Understanding of Electrical ELV works for Commercial Buildings / Spaces and should know most of the requirements below listed : -

Well Versed with Design , Installation Testing Commissioning of Internal Point Electrical Wirings

Well Versed with Design , Installation Testing Commissioning of Distribution Boards

Well Versed with TTA type HT , LT Sub Panels Design , BOM Validation , Installation Testing Commissioning

Well Versed with Installations laying of Cable Trays , Raceways , PVC GI Conduits along with Cable Layings and Terminations

Well Versed with APFC Panels Design , BOM Validation , Installation Testing Commissioning

Well Versed with Design , Installation Testing Commissioning of External Lighting

Well Versed with Installations , Terminations, Testing Commissioning of Dry Type Transformers

Well Versed with Design , Installations , Terminations, Testing Commissioning of Lighting Protection System

Well Versed with Design , Installations , Terminations, Testing Commissioning of Earthings

Well Versed with Installations , Terminations, Testing Commissioning of Solar Panels

Advantage : -

Should have knowledge of Extra Low Voltage Works ( like Fire Alar System , PA system , Networking Wifi System, CCTV System , Access Control System, BMS system , EPABX System

2. Roles Responsibilities : -
• Provide inputs for bar chart preparation, Selection of site staff, working team and sub contractors.
• Provide Inputs for change in design or make of material, client details, consultants details, inventory forms etc.
• Develop the rappo with client site team.
• Day to Day site monitoring progress report to Project Manager back office.
• Every Commercial Project Site Incharge has to stay at office from 6 : 30pm to 7 : 30pm daily or minimum three days Provide WEEKLY LOOK AHEAD for material requirement and other technical input to back office.
• Control Coordinating the workers.
• Planning of the material is to be done for prevention of Financial Loss stress creation and Building a good image.
• Making of Material Requisition (MR) in standard format clearly define the day on which material will be rquired. MR should be approved through Manager (Projects) then sent to Purchase dept.
• Responsibility to submit any papers related to the site in the back office to the appropriate department.
• Site administration, Establishment of site facilities.
• Make Arrange the Space to safeguard the material on site untill the completion of Project.
• If Received Challan copy is not received(Local Site : Max. 3 Days, Outside site : Max. 7 Days) Information to Purchase Assistant (Mr.

Girish) should be provided and close the loop.
• Make DPR and weekly progress report of the work completed and submitt to Manager (Projects).
• The Measurement sheet of the work done should be prepared submitted to the client for certification by client representative before 10th of every Month.
• Responsibility to complete the work as per the given commitment to client.
• Getting completion report after completion of the Project Submit for invoicing in maximum 15 Days after completion of Project.
• Incharge has to report confidential report to the project subordinates.
• After Completion of work excess material is to be submitted in store after reconcillation as per format.
• Responsible for liasioning activities including Co-ordination with Head Office, Consultants, Site supervisors client representative.
• Ensure mobilization and proper utilization of resources.
• Planning, monitoring controlling all site activities including manpower planning, resource planning material planning and finalization of responsibility matrix for site engineers.
• Ensuring all site activities are carried out as per SOPs (standard operating procedures), DACP as per ISO +001, OHSAS (ISO 18001), Project specification.
• Analyzing the major scope of work at site (as per the Contract) and discussing with various disciplines for criticalities strategies for timely completion of site work.
• Coordinating monitoring with various site contractors and nominating engineers, site supervisor for supervision of work of various contractors
• Attending site coordination meeting with client on regular basis for reviewing site progress resolving problems
• Responsible for Project Cost control and analysis for site activities.
• Co-ordination with Project Manger and all persons related to the site.
• Providing required information to back office for smooth execution of projects such as all statutory compliance as per client requirement.
• Responsible for highest quality deliverance with respect to aesthetics electrical safety.
• Site incharge is responsible to get the original invoice and send it to H.O within 3 working days from date of purchase or service to avoid accounting discrepancy.

3. Software Workings :

Autocads , MS Office , Beam

4. Educational Background :

A degree in Electrical Engineering, Electrical Technology, or a related field.

Higher Degree shall be advantageous if any
TIRUPATI SALES CORPORATION •
TIRUPATI SALES CORPORATION •
7351 active listings
Are you a professional Recruiter? Create an account