Candidate shall have experience on handling large/medium size project independently
Thorough knowledge on erection of different electrical equipment, Large size transformers & Motors, 33/11/6.6 KV Switch boards, Instruments and PLC/DCS.
Knowledge of Prima Vera/ MS project and other tools of measuring project performance.
Must be able to lead E&I, erection, testing and commissioning of HT / LT transformers, HT Switch Gears, LT Switch Gears including PCC/PDB/MCC/Soft starters/ VVVF Drives, Illumination System, Earthing, System, and Cabling.
Field instruments (Pressure, Level, Flow, Temperature) VVVF Drives, Control Valves, Electronic, Earthing System, SCADA, PLC & DCS system and Cabling.
Supervision of electrical engineers, erection.
Should be able to plan project execution activities, in terms of manpower, material, machinery, time and cost and should be able to execute the project within the budgeted cost and time and maintaining quality & safety measures contractors.